Heat Conducting News

Heat Conducting News

Heat Conducting News    TECHNICAL INFORMATION

BLYGOLD POLUAL:
EXTRA ENERGY SAVING!!

If corrosion occurs and pollution will adhere – without any corrective or preventive measurements – the performance can decrease dramatically. And if we speak about the performance of a coil, which is related to airside pressure drop and thermal resistance, everybody knows that a treatment and professional cleaning is not only the key to a longer life time of the coil, but what is more important; saving money on the energy bill.

This was found again in an independent test at the French company Rexan Beauty, located near Lyon. This cosmetics manufacturer has had a chiller (RTAB 212) for over three years. It is used for the manufacturer’s production process, which runs 16 hours a day, 365 days a year.
The annual maintenance of the coils – which were made from aluminum without protective coating – during this period was periodical rinsing. However, after they found that the coils – partly as a result of this – were extremely dirty, Rexan Beauty decided to have the coils professionally cleaned and treated with Blygold PoluAl.

Subsequent measurements showed that the coil performance increased:

  • Lower pressure drop
  • Bigger air capacity
  • Better heat transfer

MEASUREMENTS

Data
Type of Measurement
Before Treatment
After Treatment
CIRCUIT A
PRESSURE DROP Pa
AIR SPEED m/s
AIR FLOW m³/h
110
1,13
16957
80
1,97
29594*
CIRCUIT B
PRESSURE DROP Pa
AIR SPEED m/s
AIR FLOW m³/h
105
1,511
22735
95
2,23
33614

*Note; in the past they changed a fan into a wrong position!

Impressive figures, which conclude tremendous energy savings, and are easy to quantify:

Starting point
      Increase of condensing T by 1 , KW input increases by 1,75%
      Increase of condensing T by 1 , cooling capacity decreases by 1,1%

Energy input

18 (δτ) * 1,75% 
  = + 31,5%
   = 151,4 KW, an increase of 36,2 KW

Cooling capacity

18 (δτ) * 1,1%
  = * 19,8%
   = 280,8 KW, a downfall of 69,3 KW

Energy consumption

  • 36,2 KW per hour = 579,2 KW per hours (one day)
  • Annual extra energy consumption 211408 KW
  • Average price per KW US$ 0.125

TOTAL ANNUAL EXTRA ENERGY CONSUMPTION: US$ 26,430 per year

If treated with PoluAl coating and cleaned thoroughly twice. During the 5-year warranty period, the condenser would deliver its nominal performance. Provided the fouling conditions and cleaning by the customer. Compared to the cost of this treatment and the costs of increased energy consumption, this means that the pay back period would be app. 2,5 month.

Blygold warrants the anti-corrosion treatment for at least five years, incl. a two time thorough cleaning by certified engineers.

Note
The pay back period will differ in each scenario. The differences between a five year Blygold treatment and the increase of energy costs are tremendous. However, it is fair to conclude that a non feasibility-case rarely occurs.

Technical information of the unit at Rexan Beauty

 * Unit
 RTAB 212
 * Compressor
 SCREW
 * Refrigerant
 R22
 * Circuits
 TWO
 * Surface coil
 11,6 m² (faced area)
 * Coil Design
 Slit fin, 17FPI
 * Normal cooling capacity
 350,1 KW (T air inlet = +30°C, T water outlet = +7°C)
 * Normal KW input  115,2 KW (T air inlet = +30°C, T water outlet = +7°C)
 * Normal air debit
 +33500 m³/h per circuit
 * δτ Nominal condensing temp
 15°C
 * δτ Measured condensing temp
        (before PoluAI treatment and cleaning)
 33°C (increase of 18°C)
 